Description: Nuclear Weapons by U.S. Goverment Accountability Office, U.S. Government Estimated delivery 3-12 business days Format Paperback Condition Brand New Description Built in the 1940s and 1950s, the Y-12 National Security Complex, located in Oak Ridge, Tennessee, is the National Nuclear Security Administrations (NNSA) primary site for enriched uranium activities. Because Y-12 facilities are outdated and deteriorating, NNSA is building a more modern facility--known as the Uranium Processing Facility (UPF). NNSA estimates that the UPF will cost up to $3.5 billion and save over $200 million annually in operations, security, and maintenance costs. NNSA also plans to include more advanced technologies in the UPF to make uranium processing and component production safer. GAO was asked to (1) assess NNSAs estimated cost and schedule for constructing the UPF; (2) determine the extent to which UPF will use new, experimental technologies, and identify resultant risks, if any; and (3) determine the extent to which emerging changes in the nuclear weapons stockpile could affect the UPF project. To conduct this work, GAO reviewed NNSA technology development and planning documents and met with officials from NNSA and the Y-12 plant. The UPF project costs have increased since NNSAs initial estimates in 2004 and construction may be delayed due to funding shortfalls. NNSAs current estimate prepared in 2007 indicates that the UPF will cost between $1.4 and $3.5 billion to construct--more than double NNSAs 2004 estimate of between $600 million and $1.1 billion. In addition, costs for project engineering and design, which are less than halfway completed, have increased by about 42 percent--from $297 to $421 million--due in part to changes in engineering and design pricing rates. With regard to the projects schedule, NNSA currently estimates that UPF construction will be completed as early as 2018 and as late as 2022. However, because of a funding shortfall of nearly $200 million in fiscal year 2011, NNSA officials expect that the UPF will not be completed before 2020, which could also result in additional costs. NNSA is developing 10 new technologies for use in the UPF and is using a systematic approach--Technology Readiness Levels (TRL)--to gauge the extent to which technologies have been demonstrated to work as intended. Industry best practices and Department of Energy (DOE) guidance recommend achieving specific TRLs at critical project decision points--such as establishing a cost and schedule performance baseline or beginning construction--to give optimal assurance that technologies are sufficiently ready. If critical technologies fail to work as intended, NNSA may need to revert to existing or alternate technologies, possibly resulting in changes to design plans and space requirements that could delay the project and increase costs. Changes in the composition and size of the nuclear weapons stockpile could occur as a result of changes in the nations nuclear strategy, but NNSA officials and a key study said that the impact of these changes on the project should be minor. For example, the New Strategic Arms Reduction Treaty signed in April 2010 by the leaders of the United States and Russia would, if ratified, reduce the number of deployed strategic warheads from about 2,200 to 1,550. According to NNSA officials, NNSA and DOD have cooperated closely and incorporated key nuclear weapons stockpile changes into UPFs design. Also, an independent study found that most of the UPFs planned space and equipment is dedicated to establishing basic uranium processing capabilities that are not likely to change, while only a minimal amount--about 10 percent--is for meeting current stockpile size requirements. GAO is making five recommendations for, among other things, improving the UPFs cost and funding plans, ensuring that new UPF technologies reach optimal levels of maturity prior to critical project decisions, and for improving DOE guidance. NNSA generally agreed with the recommendations. Details ISBN 1479121800 ISBN-13 9781479121809 Title Nuclear Weapons Author U.S. Goverment Accountability Office, U.S. Government Format Paperback Year 2012 Pages 40 Publisher Createspace Independent Publishing Platform GE_Item_ID:93107247; About Us Grand Eagle Retail is the ideal place for all your shopping needs! With fast shipping, low prices, friendly service and over 1,000,000 in stock items - you're bound to find what you want, at a price you'll love! Shipping & Delivery Times Shipping is FREE to any address in USA. Please view eBay estimated delivery times at the top of the listing. Deliveries are made by either USPS or Courier. We are unable to deliver faster than stated. International deliveries will take 1-6 weeks. NOTE: We are unable to offer combined shipping for multiple items purchased. This is because our items are shipped from different locations. Returns If you wish to return an item, please consult our Returns Policy as below: Please contact Customer Services and request "Return Authorisation" before you send your item back to us. Unauthorised returns will not be accepted. Returns must be postmarked within 4 business days of authorisation and must be in resellable condition. Returns are shipped at the customer's risk. We cannot take responsibility for items which are lost or damaged in transit. For purchases where a shipping charge was paid, there will be no refund of the original shipping charge. Additional Questions If you have any questions please feel free to Contact Us. Categories Baby Books Electronics Fashion Games Health & Beauty Home, Garden & Pets Movies Music Sports & Outdoors Toys
Price: 21.11 USD
Location: Fairfield, Ohio
End Time: 2024-12-24T10:16:21.000Z
Shipping Cost: 0 USD
Product Images
Item Specifics
Restocking Fee: No
Return shipping will be paid by: Buyer
All returns accepted: Returns Accepted
Item must be returned within: 30 Days
Refund will be given as: Money Back
ISBN-13: 9781479121809
Type: NA
Publication Name: NA
Book Title: Nuclear Weapons : National Nuclear Security Administration's Plans for Its Uranium Processing Facility Should Better Reflect Funding Estimates and Technology Readiness
Number of Pages: 38 Pages
Language: English
Publisher: CreateSpace
Topic: Power Resources / Nuclear
Publication Year: 2012
Item Height: 0.1 in
Genre: Technology & Engineering
Item Weight: 5.3 Oz
Author: U. S. Goverment Office
Item Length: 11 in
Item Width: 8.5 in
Format: Trade Paperback